TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download
Page 405 of 1632
TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2  2-1281 2-1281 2-1281 2-1281 2-1281  CONTINUITY TEST  CONTINUITY TEST  (1) Loosen four screws on junction box.  (2) Open cover on junction box.  (3) Disconnect boom down lockout solenoid cable  connector from boom down lockout solenoid  valve.  (4) Set multimeter to ohms.  (5) Connect positive (+) probe of multimeter in  socket 1 of boom down lockout solenoid cable.  (6) Connect negative (-) probe of multimeter to  terminal board position 28 and note reading on  multimeter.  (7) If continuity is not present, replace boom down  lockout solenoid cable (para 7-85).  (1) Set multimeter to ohms.  (2) Connect positive (+) probe of multimeter in  socket 2 of boom down lockout solenoid cable  connector.  (3) Connect negative (-) probe of multimeter on  ground in junction box and note reading on  multimeter.  (4) If continuity is not present, replace boom down  lockout solenoid cable (para 7-85).  (5) Connect boom down lockout solenoid cable  connector to boom down lockout solenoid valve.  (6) Close cover on junction box.  (7) Tighten four screws on junction box cover.