TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download
Page 315 of 1632
TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2  2-1191 2-1191 2-1191 2-1191 2-1191  CONTINUITY TEST  (1) Disconnect hoist down solenoid connector from  hoist up solenoid.  (2) Set multimeter to ohms.  (3) Connect positive (+) probe of multimeter on pin  2 of hoist down solenoid cable connector.  (4) Connect negative (-) probe of multimeter on  ground and note reading on multimeter.  (5) Connect positive (+) probe of multimeter on pin  1 of hoist down solenoid cable connector.  (6) Connect negative (-) probe of multimeter on  terminal board lower position 24 and note  reading on multimeter.  (7) If continuity is not present, replace hoist down  solenoid cable (para 7-91).  (8) If continuity is present, notify DS Maintenance.  (9) Connect hoist down solenoid cable connector to  hoist down solenoid.  (10) Close cover on junction box.  (11) Tighten four screws on junction box cover.  (12) Stow crane (TM 9-2320-366-10-1).