TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download

Page 307 of 1632

TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 2-1183 2-1183 2-1183 2-1183 2-1183 CONTINUITY TEST (1) Remove HOIST UP/DOWN controller (para 7-32). (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter on pin F of remote control box connector. (4) Connect negative (-) probe of multimeter on pin 3 of HOIST UP/DOWN controller internal wiring harness and note reading on multimeter. (5) Connect positive (+) probe of multimeter on pin H of remote control box connector. (6) Connect negative (-) probe of multimeter on pin 1 of HOIST UP/DOWN controller internal wiring harness and note reading on multimeter. (7) If continuity is not present, replace remote control box internal wiring harness (para 7-32). (8) If continuity is present, replace HOIST UP/DOWN controller (para 7-32). (9) Install HOIST UP/DOWN controller (para 7-32). (10) Close cover on junction box. (11) Tighten four screws on junction box cover. (12) Stow crane (TM 9-2320-366-10-1).