TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download

Page 281 of 1632

TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 2-1157 2-1157 2-1157 2-1157 2-1157 CONTINUITY TEST (1) Connect connector P80B to air dryer. (2) Disconnect connector P80 from connector J80A. (3) Set multimeter to ohms. (4) Connect positive (+) probe of multimeter to connector P80-1. (5) Connect negative (-) probe of multimeter to ground and note reading on multimeter. (6) If continuity is not present, repair wire 3009 in start and charging cable assembly (para 2-45) or replace start and charging cable assembly (para 7-132). (7) If continuity is present, repair wire 3009 in dump cable assembly (para 2-45) or replace dump cable assembly (para 7-124). (8) Connect connector P80 to connector J80A.