TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download
Page 265 of 1632
TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 2-1141 2-1141 2-1141 2-1141 2-1141 CONTINUITY TEST (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to PDP, terminal 85, where relay K19 was removed. (3) Connect negative (-) probe of multimeter to ground and note reading on multimeter. (4) If continuity is not present, repair wire 3016 (para 2-45) or replace WTEC II dashboard cable assembly (para 7-10) or WTEC III dashboard cable assembly (para 7-11). (5) If continuity is present, replace relay K19 (para 7-9). (6) Install relay K19 in PDP. (7) Install PDP cover (para 16-2).