TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download
Page 203 of 1632
TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 2-1079 2-1079 2-1079 2-1079 2-1079 CONTINUITY TEST CONTINUITY TEST (1) Remove seven screws and washers from cover. (2) Remove screw, washer, cover, and nut from WTEC II VIM. (3) Remove relay SF04 from WTEC II VIM. (4) Set multimeter to ohms. (5) Connect positive (+) probe of multimeter to relay SF04 terminal 30. (6) Connect negative (-) probe of multimeter to relay SF04 terminal 87a and note reading on multimeter. (7) If continuity is not present, replace relay SF04 in WTEC II VIM (para 8-6). (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to relay SF04 terminal 86. (3) Connect negative (-) probe of multimeter to relay SF04 terminal 85 and note reading on multimeter. (4) If continuity is not present, replace relay SF04 in WTEC II VIM (para 8-6). (5) Install relay SF04 in WTEC II VIM. (6) Install cover on WTEC II VIM with nut, washer, and screw. (7) Install seven washers and screws in cover.