TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download
Page 151 of 1632
TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 2-1037 2-1037 2-1037 2-1037 2-1037 CONTINUITY TEST (1) Remove WTEC III relay K37 from PDP. (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to connector J913-15. (4) Connect negative (-) probe of multimeter to PDP, terminal 30, where WTEC III relay K37 was removed, and note reading on multimeter. (5) If continuity is not present, repair wire 1904 (para 2-45) or replace WTEC III dashboard cable assembly (para 7-11). (6) Install WTEC III relay K37 in PDP.