TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download
Page 105 of 1632
TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 2-991 2-991 2-991 2-991 2-991 CONTINUITY TEST (1) Remove six screws from auxiliary panel. (2) Lift auxiliary panel from auxiliary panel housing to gain access. (3) Disconnect connector P903 from WINCH IN/OUT switch. (4) Set multimeter to ohms. (5) Connect positive (+) probe of multimeter to WINCH IN/OUT switch terminal 3. (6) Connect negative (-) probe of multimeter to WINCH IN/OUT switch terminal 1. (7) Position WINCH IN/OUT switch to in (TM 9-2320-366-10-1) and note reading on multimeter. (8) If continuity is not present, replace WINCH IN/OUT switch (para 7-18).