TM-9-2320-366-20-1 MTV Unit Maintenance Manual M1083 Series - Volume 1 Download

Page 769 of 1824

TM 9-2320-366-20-1 TM 9-2320-366-20-1 TM 9-2320-366-20-1 TM 9-2320-366-20-1 TM 9-2320-366-20-1 2-481 2-481 2-481 2-481 2-481 CONTINUITY TEST (1) Disconnect connector P210 from connector J210. (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to J210-6. (4) Connect negative (-) probe of multimeter to P913-13 and note reading on multimeter. (5) If continuity is not present, repair wire 2021 (para 2-45) or replace auxiliary panel cable assembly (para 7-58). (6) If continuity is present, repair wire 2021 (para 2-45) or replace PTO cable assembly (para 7-127). (7) Connect connector J210 to connector P210. (8) Connect connector P913 to connector J913. (9) Install personnel heater (para 18-9).