TM-9-2320-366-20-1 MTV Unit Maintenance Manual M1083 Series - Volume 1 Download

Page 441 of 1824

CONTINUITY TEST (1) Remove circuit breaker CB70 from PDP. (2) Position master power switch to on (TM 9-2320-366-10-1). (3) Set multimeter to ohms. (4) Connect positive (+) probe of multimeter to relay K2 socket 86 on PDP. (5) Connect negative (-) probe of multimeter to circuit breaker CB70 socket 4 on PDP and note reading on multimeter. (6) If continuity is not present, go to step 14 of this fault. (7) Position master power switch to off (TM 9-2320-366-10-1). (8) Install circuit breaker CB70 in PDP. TM 9-2320-366-20-1 Change 1 2-277