TM-9-2320-366-20-1 MTV Unit Maintenance Manual M1083 Series - Volume 1 Download
Page 421 of 1824
CONTINUITY TEST (1) Disconnect batteries (para 7-57). (2) Remove nut, lockwasher, washer, and terminal lug TL47 from left 12V BAT terminal stud on 200 AMP terminal block. Discard lockwasher. (3) Remove nut, lockwasher, washer, and terminal lugs TL171 and TL61 from right 12V BAT terminal stud on 200 AMP terminal block. Discard lockwasher. (4) Set multimeter to ohms. (5) Connect positive (+) probe of multimeter to left 12V BAT terminal stud on 200 AMP terminal block. (6) Connect negative (-) probe of multimeter to right 12V BAT terminal stud on 200 AMP terminal block and note reading on multimeter. (7) If continuity is not present, replace 200 AMP terminal block (para 20-58). (8) Position terminal lug TL47 on left 12V BAT terminal stud on 200 AMP terminal block with washer, lockwasher, and nut. (9) Tighten nut to 15-19 lb-ft (21-25 N.m). TM 9-2320-366-20-1 Change 1 2-266.25