TM-9-2320-366-20-1 MTV Unit Maintenance Manual M1083 Series - Volume 1 Download

Page 343 of 1824

CONTINUITY TEST (1) Remove relay K11 from PDP. (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to relay K24 socket 85 on PDP. (4) Connect negative (-) probe of multimeter to relay K11 socket 85 on PDP and note reading on multimeter. (5) If continuity is not present, repair wire 34 from relay K24 socket 85 on PDP to relay K11 socket 85 on PDP (para 2-45) or replace WTEC II dashboard cable assembly (para 7-10) or WTEC III dashboard cable assembly (para 7-11). (6) Install relay K24 in PDP. TM 9-2320-366-20-1 Change 1 2-213