TM-9-2320-366-20-1 MTV Unit Maintenance Manual M1083 Series - Volume 1 Download

Page 1343 of 1824

TM 9-2320-366-20-1 TM 9-2320-366-20-1 TM 9-2320-366-20-1 TM 9-2320-366-20-1 TM 9-2320-366-20-1 2-779 2-779 2-779 2-779 2-779 CONTINUITY TEST CONTINUITY TEST (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to terminal lug TL154. (3) Connect negative (-) probe of multimeter to PDP, terminal 85, where relay K6 was removed, and note reading on multimeter. (4) If continuity is not present, repair wire 1594 (para 2-45) or replace WTEC II dashboard cable assembly (para 7-10) or WTEC III dashboard cable assembly (para 7-11). (5) Install relay K6 in PDP. (6) Install PDP cover (para 16-2). (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to terminal lug TL155. (3) Connect negative (-) probe of multimeter to ground and note reading on multimeter. (4) If continuity is not present, repair wire 3043 (para 2-45) or replace WTEC II dashboard cable assembly (para 7-10) or WTEC III dashboard cable assembly (para 7-11). (5) If continuity is present, replace both stoplight switches (para 11-27).