TM-9-2320-366-20-1 MTV Unit Maintenance Manual M1083 Series - Volume 1 Download

Page 1323 of 1824

TM 9-2320-366-20-1 Change 1 2-759 CONTINUITY TEST (1) Remove three screws and washers from PDP. (2) Remove three screws from PDP. (3) Lift PDP outward to gain access. (4) Set multimeter to ohms. (5) Connect positive (+) probe of multimeter to terminal board TB1 position 27. (6) Connect negative (-) probe of multimeter to diode D1A terminal 1 and note reading on multimeter. (7) If continuity is not present, repair wire 22 from terminal board TB1 position 27 to diode D1A terminal 1 (para 2-45) 1 or replace WTEC II dashboard cable assembly (para 7-10) or WTEC III dashboard cable assembly (para 7-11). (8) If continuity is present, replace diode D1A (para 7-9). (9) Install PDP on dashboard with three screws. (10) Install three washers and screws in PDP. (11) Install diode D1A in PDP. (12) Install PDP cover (para 16-2).