TM-9-2320-366-10-2 MTV Operator Manual M1083 Series - Volume 2 Download

Page 732 of 930

TM 9-2320-366-10-2 3-13. M1094 AIR DROP RECOVERY OPERATIONS This task covers: a. Cab Recovery b. Spare Tire Recovery c. Slide Assembly Recovery d. Load Spreader Recovery e. Follow-On Maintenance INITIAL SETUP Equipment Conditions Vehicle parked on level ground. Engine shut down (para 2-27f). Wheels chocked (para 2-27h). Tools and Special Tools Wrench Assembly, Speedhandle (Item 24 (COEI), Appendix B). Wrench, Adjustable, 8 in. (Item 50, Appendix B). Tools and Special Tools (cont) Strap Assembly (Item 23 (COEI), Appendix B) Sling Assembly, Air Drop Roof (Item 22 (COEI), Appendix B) References FM 10-526 Personnel Required (2) a. Cab Recovery. WARNING Vehicle must not be operated until rear panel and side panels are raised and properly secured. Failure to comply may result in serious injury or death to personnel or damage to equipment. NOTE Steps (1) through (36) require the aid of an assistant. (1) Raise rear panel (1) and fasten five panel latches (2). 3-182 Change 1