TM-9-2320-366-10-2 MTV Operator Manual M1083 Series - Volume 2 Download

Page 72 of 930

TM 9-2320-366-10-2 2-42. 30K WINCH OPERATION (CONT) CAUTION Cable tension must be checked prior to use. Some slack in the cable is desired. Excessive tension can cause damage to power fairlead and cable. Failure to comply may result in damage to equipment. (11) Position MAIN WINCH RH switch (11) to OUT. (12) Pay out cable (12) for approximately 20 seconds. 2-460