TM-9-2320-366-10-2 MTV Operator Manual M1083 Series - Volume 2 Download
Page 712 of 930
TM 9-2320-366-10-2 3-11. M1093 AIR DROP RECOVERY OPERATIONS (CONT) e. Load Spreader Recovery. NOTE • Left and right side load spreaders are installed the same way. Right side shown. • Steps (1) through (5) require the aid of an assistant. (1) Remove pin (1) and shackle (2) from front load spreader (3). (2) Remove two safety pins (4), two pins (5), and front load spreader (3) from front bumper (6). (3) Install shackle (2) and pin (1) on front bumper (6). (4) Position front load spreader (3) and two pins (5) on stowage location on vehicle. (5) Install two safety pins (7) on two pins (5). f. Follow-On Maintenance. (1) Install side panels (para 2-32e). (2) Remove wheel chocks (para 2-27h). (3) Notify Unit Maintenance to torque air intake adapter clamp in accordance with maintenance paragraph. (4) Notify Unit Maintenance to tighten nuts on mirror to 21-27 lb-ft (29-37 N·m). End of Task. 3-162 Change 1