TM-9-2320-366-10-2 MTV Operator Manual M1083 Series - Volume 2 Download

Page 62 of 930

TM 9-2320-366-10-2 2-42. 30K WINCH OPERATION (CONT) NOTE If weight of equipment to be recovered exceeds 15 tons (14 metric tons), refer to FM 20-22 for operational requirements and para 2-77 for snatch block installation/removal. (22) Position MAIN WINCH RH switch (11) to OUT and pay out cable (12) to vehicle to be recovered. NOTE Perform steps (23) through (32) when recovering a vehicle. (23) Remove cotter pin (15) and pin (16) from socket (17). (24) Connect socket (17) to vehicle to be recovered. (25) Install pin (16) and cotter pin (15) in socket (17). 2-450 Change 1