TM-9-2320-366-10-2 MTV Operator Manual M1083 Series - Volume 2 Download
Page 415 of 930
TM 9-2320-366-10-2 (11) Place BOOM lever (14) in DOWN position and operate hydraulic pump (3) to fully lower boom (7). (12) Connect hook assembly (5) to stowage ring (15). (13) Place HOIST lever (4) in UP position and operate hydraulic pump (3) to remove all slack from cable (8). NOTE Both outrigger pads are removed from outriggers the same way. Right outrigger shown. (14) Remove two pins (16) from outrigger pads (17). 2-797