TM-9-2320-366-10-2 MTV Operator Manual M1083 Series - Volume 2 Download

Page 312 of 930

TM 9-2320-366-10-2 2-50. WRECKER MATERIAL HANDLING CRANE (MHC) OPERATION (CONT) j. Stow Outriggers and Shut Down MHC. NOTE Both outrigger pads are removed from outriggers the same way. Right outrigger pad shown. (1) Remove two pins (1) from outrigger pads (2). NOTE Operate LH O/R JACK lever and RH O/R JACK lever at the same time. (2) Move LH O/R JACK lever (3) and RH O/R JACK lever (4) to UP position until outriggers (5) are fully retracted. (3) Install two pins (1) in outrigger pads (2). (4) Stow two outrigger pads (2) in tool box. 2-688