TM-9-2320-366-10-2 MTV Operator Manual M1083 Series - Volume 2 Download
Page 299 of 930
TM 9-2320-366-10-2 CAUTION There should be no movement of Material Handling Crane (MHC) during this check. If there is movement in MHC, notify Unit Maintenance. Failure to comply may result in damage to equipment. (c) Continue holding HOIST lever (1) in UP position while placing TELESCOPE lever (11) in OUT position and BOOM lever (2) first in the UP position and then in the DOWN position. CAUTION Approximately six seconds should pass before Overload Shutdown System (OSS) resets and boom responds to down movement. If no movement occurs, notify Unit Maintenance. Failure to comply may result in damage to equipment. (d) While holding BOOM lever (2) in the DOWN position, pay out hook assembly (4) so no contact is made with boom nose (10). (e) Press MANUAL OVERRIDE switch (12) to reset. 2-675