TM-9-2320-366-10-2 MTV Operator Manual M1083 Series - Volume 2 Download

Page 298 of 930

TM 9-2320-366-10-2 2-50. WRECKER MATERIAL HANDLING CRANE (MHC) OPERATION (CONT) (7) To pre-operational check MHC Overload Shutdown System (OSS) perform the following: (a) Place HOIST lever (1) in UP position until hook assembly (4) is against boom nose (10). NOTE Hydraulic system is in by-pass mode when hydraulic system no longer operates. (b) Hold HOIST lever (1) in UP position until hydraulic system is in by-pass mode. 2-674