TM-9-2320-366-10-2 MTV Operator Manual M1083 Series - Volume 2 Download
Page 295 of 930
TM 9-2320-366-10-2 d. Raise Boom to Operating Position. WARNING Do not disconnect cable from stowage ring until boom is raised to a 30- degree angle. Hook assembly could fall. Failure to comply may result in injury to personnel. CAUTION Do not allow excessive slack to build-up when paying out cable. Cable may get tangled on drum. Failure to comply may result in damage to equipment. NOTE Operate HOIST lever and BOOM lever at the same time. (1) Move HOIST lever (1) to DOWN position and BOOM lever (2) to UP position until boom is at a 30-degree angle. (2) Remove safety pin (3) from hook assembly latch (4). (3) Disconnect hook assembly (5) from stowage ring (6). 2-671