TM-9-2320-366-10-2 MTV Operator Manual M1083 Series - Volume 2 Download

Page 292 of 930

TM 9-2320-366-10-2 2-50. WRECKER MATERIAL HANDLING CRANE (MHC) OPERATION (CONT) c. Set Up Outriggers. WARNING Area must be clear on both sides of vehicle before extending outriggers. Failure to comply may result in serious injury to personnel. (1) Move O/R JACK lever (1) to OUT position until outriggers are fully extended. NOTE Both outrigger pads are installed on outriggers the same way. Right outrigger pad shown. (2) Remove two outrigger pads (2) from tool box. (3) Remove two pins (3) from outrigger pad (2). (4) Clean all dirt and debris from socket (4) in outrigger pad (2) and from end of outrigger (5). (5) Install outrigger pad (2) on end of outrigger (5) with pin (3). 2-668