TM-9-2320-366-10-2 MTV Operator Manual M1083 Series - Volume 2 Download

Page 168 of 930

TM 9-2320-366-10-2 2-47. M35 SERIES TOWING CONNECTION/DISCONNECTION (CONT) (2) Prepare underlift assembly for operation (para 2-44a). NOTE Perform step 3 if assistant is not available to aid in towing connection. (3) Connect WRECKER REMOTE CONTROL (para 2-44b). (4) Remove two lynch pins (5) and large pins (6) from two lift tools (7). (5) Remove two lynch pins (8) and small pins (9) from two lift tools (7). NOTE • Top bumper lift tools are installed with small pin holes facing toward rear of crossbar. • Left and right side top bumper lift tools are installed on lift tools the same way. Left side shown. (6) Install two top bumper lift tools (1) on two lift tools (7) with large pins (6) and lynch pins (5). (7) Install small pins (9) and lynch pins (8) in two top bumper lift tools (1). 2-554 Change 1