TM-9-2320-366-10-1 MTV Operator Manual M1083 Series - Volume 1 Download
Page 591 of 802
TM 9-2320-366-10-1 WARNING Ensure there are at least five wraps of cable on hoist drum at all times. Failure to comply may result in serious injury or death to personnel or damage to equipment. CAUTION • Do not lift load heavier than maximum rating for Material Handling Crane (MHC) (5,000 lb (2,268 kgs)). Failure to comply may result in damage to equipment. • Do not allow excessive slack to build-up when paying out cable. Cable may get tangled on drum. Failure to comply may result in damage to equipment. • Do not jerk HOIST lever. Load may bounce and cause load to separate from hook assembly. Failure to comply may result in damage to equipment. (7) Position HOIST lever (6) to UP to lift load. (8) Position BOOM lever (1) to UP to lift load higher as required. (9) Position HOIST lever (6) to DOWN to lower load. (10) Position BOOM lever (1) to DOWN to lower load further as required. 2-373