TM-9-2320-366-10-1 MTV Operator Manual M1083 Series - Volume 1 Download

Page 590 of 802

TM 9-2320-366-10-1 2-37. M1084/M1086 MATERIAL HANDLING CRANE (MHC) OPERATION (CONT) (3) Operate SWING lever (3) and TELESCOPE lever (4) to center end of boom (5) directly over load. CAUTION • Ensure boom and load are clear of vehicle sides when loading and unloading cargo. Failure to comply may result in damage to equipment. • Use only a straight pull when lifting load. Failure to comply may result in damage to equipment. (4) Operate HOIST lever (6) to pay out or reel in cable (7) and to connect hook assembly (8) to load. (5) Connect hook assembly (8) to load. (6) Install safety pin (9) in hook assembly latch (10). 2-372 Change 1