TM-9-2320-366-10-1 MTV Operator Manual M1083 Series - Volume 1 Download

Page 584 of 802

TM 9-2320-366-10-1 2-37. M1084/M1086 MATERIAL HANDLING CRANE (MHC) OPERATION (CONT) NOTE There should be no movement of MHC during this check. If there is movement in MHC, notify Unit Maintenance. (c) Continue holding HOIST lever (1) in UP position while positioning TELESCOPE lever (16) to OUT and BOOM lever (7) first to UP and then to DOWN. NOTE Approximately six seconds should elapse before overload shutdown system resets and boom responds to down movement. If no movement occurs, notify Unit Maintenance. (d) While holding BOOM lever (7) in the DOWN position, pay out hook assembly (3) so no contact is made with boom nose (15). (e) Press MANUAL OVERRIDE switch (17) to reset. 2-366 Change 1