TM-9-2320-366-10-1 MTV Operator Manual M1083 Series - Volume 1 Download
Page 505 of 802
TM 9-2320-366-10-1 Change 2 2-300.55 NOTE • Left and right tubes are installed the same way. Left side tubes shown. • Steps (32) through (38) require the aid of an assistant. (32) Position front tube (9) through two braces (3). (33) Install front tube (9) in front bow bracket (27) and front center bow bracket (28). (34) Position two braces (3) over rear tube (2) and under left strap support (4) and right strap support (5) with approximately two feet (0.6 m) between rear center bow (14) and each brace (3).