TM-9-2320-366-10-1 MTV Operator Manual M1083 Series - Volume 1 Download
Page 413 of 802
TM 9-2320-366-10-1 (14) Adjust boom (1) so that end of boom is in line with cargo bed tiedown ring (7). (15) Place hoist control switch (8) in up position to pay out cable (9). CAUTION • Do not overtighten cable. Failure to comply may result in damage to equipment. • Tension must be maintained on cable to prevent unraveling from spool. Failure to comply may result in damage to equipment. (16) Connect hook (10) to cargo bed tiedown ring (7). (17) Place hoist control switch (8) in down position to remove slack from cable (9). 2-271