TM-9-2320-366-10-1 MTV Operator Manual M1083 Series - Volume 1 Download

Page 412 of 802

TM 9-2320-366-10-1 2-29. LIGHT MATERIAL HANDLING CRANE (LMHC) OPERATION (CONT) NOTE Perform steps (6) through (9) if boom was extended. (6) Remove quick release pin (4) from boom (1). (7) Push in end of boom extension (5) so that boom (1) is fully retracted. (8) Align holes (5) in boom (1). (9) Install quick release pin (4) in boom (1). (10) Support end of boom (1). (11) Remove quick release pin (6). (12) Lower boom (1) to stowed position. (13) Install quick release pin (6) in one of unused holes. 2-270