TM-9-2320-366-10-1 MTV Operator Manual M1083 Series - Volume 1 Download
Page 314 of 802
TM 9-2320-366-10-1 Table 2-5. Preventive Maintenance Checks and Services (M1089) (Cont) Location Item No. Interval Item to Check/ Service Crewmember Procedure Not Fully Mission Capable If: WARNING • Keep boom clear of all electrical lines and other obstacles while operating Material Handling Crane (MHC). Failure to comply may result in serious injury or death to personnel. • Area must be clear of personnel before rotating or telescoping boom. Boom must be rotated and telescoped slow enough so Operator has control of load. If Operator cannot see load during operation, operate Material Handling Crane (MHC) with REMOTE CONTROL UNIT. Failure to comply may result in serious injury or death to personnel. CAUTION Keep hook block at least 2 ft (0.61 m) from end of boom. If hook block hits end of boom, MHC will lose power for several seconds. Failure to comply may result in damage to equipment. 14 During MHC Remote Controls (Cont) f. Move SWING lever to CW position to move boom to right. g. Move SWING lever to CCW position to move boom to left. f. Boom does not rotate to right. g. Boom does not rotate to left. 2-176