TM-9-2320-366-10-1 MTV Operator Manual M1083 Series - Volume 1 Download

Page 280 of 802

TM 9-2320-366-10-1 Table 2-3. Preventive Maintenance Checks and Services (M1084 and M1086) (Cont) Location Item No. Interval Item to Check/ Service Crewmember Procedure Not Fully Mission Capable If: 3 During MHC Remote Controls (Cont) k. Place BOOM lever in UP position to decrease boom angle. l. Place HOIST lever in DOWN position to pay out cable. m. Place HOIST lever in UP position to reel in cable. k. Boom angle does not increase. l. Hoist does not pay out cable. m. Hoist does not reel in cable. n. Operate SWING lever to align holes in turntable bearing and install turntable bearing retaining pin. 2-142