TM-9-2320-366-10-1 MTV Operator Manual M1083 Series - Volume 1 Download

Page 278 of 802

TM 9-2320-366-10-1 Table 2-3. Preventive Maintenance Checks and Services (M1084 and M1086) (Cont) Location Item No. Interval Item to Check/ Service Crewmember Procedure Not Fully Mission Capable If: WARNING Keep boom clear of all electrical lines and other obstacles while operating Material Handling Crane (MHC). Failure to comply may result in serious injury or death to personnel. Area must be clear of personnel before rotating or telescoping boom. Boom must be rotated and telescoped slow enough so Operator has control of load. If Operator cannot see load during operation, operate Material Handling Crane (MHC) with REMOTE CONTROL UNIT. Failure to comply may result in serious injury or death to personnel. 3 During MHC Remote Controls (Cont) e. Connect REMOTE CONTROL UNIT (para 2-37e). f. Place SWING lever to CW position to move boom to right. g. Place SWING lever to CCW position to move boom to left. f. Boom does not rotate to right. g. Boom does not rotate to left. 2-140