TM-9-2320-366-10-1 MTV Operator Manual M1083 Series - Volume 1 Download
Page 274 of 802
TM 9-2320-366-10-1 Table 2-3. Preventive Maintenance Checks and Services (M1084 and M1086) (Cont) Location Item No. Interval Item to Check/ Service Crewmember Procedure Not Fully Mission Capable If: CAUTION Keep hook block at least 2 ft (0.6 m) from end of boom. If hook block hits end of boom, Material Handling Crane (MHC) will lose power for several seconds. Failure to comply may result in damage to equipment. 2 During MHC Operation (Cont) l. Place TELESCOPE lever in OUT position and HOIST lever in DOWN position (para 2- 37f) to extend boom. m. Check all three sections of boom extension for broken welds and other obvious damage. n. Place TELESCOPE le- ver to IN position and HOIST lever in UP position (para 2-37f) to retract boom. l. Boom does not extend or cable does not pay out. m. Any broken welds or other obvious damage are found. n. Boom does not retract or cable does not pay in. 2-136