TM-9-2320-365-34-2 LMTV Direct Maintenance Manual M1078 Series - Volume 2 Download
Page 638 of 1414
TM 9-2320-365-34-2  13-15. M1081 SUBFRAME RAIL REPLACEMENT (CONT)  b. Installation.  NOTE  • Left and right side subframe rails are installed  the same way. Right side shown.  • Install subframe rails from rear of vehicle.  • Step (1) requires the aid of two assistants.  (1) Position subframe rail (1) on vehicle.  CAUTION  Ensure subframe rail flange is in contact with  main frame rail flange. Failure to comply  may result in damage to equipment.  NOTE  Steps (2) through (9) require the aid of an  assistant.  (2) Position three bolts (2) in bracket (3) with three self-  locking nuts (4).  (3) Tighten three self-locking nuts (4) to 210-225 lb-ft (285-  305 N·m).  (4) Position two bolts (5) in bracket (6) with two self-locking  nuts (7).  (5) Tighten two self-locking nuts (7) to 210-225 lb-ft (285-  305 N·m).  (6) Position two bolts (8) in rear support brace (9) with two  self-locking nuts (10).  (7) Tighten two self-locking nuts (10) to 210-225 lb-ft (285-  305 N·m).  13-78 Change 1