TM-9-2320-365-34-2 LMTV Direct Maintenance Manual M1078 Series - Volume 2 Download
Page 482 of 1414
TM 9-2320-365-34-2  (30) Deleted.  (31) Deleted.  (32) Deleted.  (33) Deleted.  c. Follow-On Maintenance.  (1) Fill front differential carrier with oil (TM 9-2320-365-20).  (1.1) Lubricate drive shaft universal joint and slip yoke (TM 9-  2320-365-20-1).  (1.2) Install gravel deflector and gravel deflector expansion  (TM 9-2330-365-20-3).  (2) Operate vehicle, checking for proper steering, braking,  and listening for unusual noises (TM 9-2320-365-10).  (3) Shut down engine (TM 9-2320-365-10).  (4) Check front axle assembly and differential carrier for oil  leaks.  (5) After first 1000 miles of vehicle operation, tighten self-  locking nuts on U-bolts, in 50 lb-ft (68 N·m) increments,  to 390-510 lb-ft (529-692 N·m) in sequence.  End of Task.  9-10 Change 1