TM-9-2320-365-34-2 LMTV Direct Maintenance Manual M1078 Series - Volume 2 Download

Page 373 of 1414

TM 9-2320-365-34-2 (7) Remove two bolts (16) and resilient mount (17) from bracket (15). d. RH Installation. (1) Position resilient mount (1) on bracket (2) with two bolts (3). (2) Tighten two bolts (3) to 76-94 lb-ft (103-127 N·m). NOTE Steps (3) through (11) require the aid of an assistant. (3) Position bracket (3) on frame rail (4) with bolt (5) and self-locking nut (6). (4) Position bolt (7) in frame rail (4) with self-locking nut (8). (5) Tighten self-locking nuts (6 and 8) to 210-225 lb-ft (285-305 N·m). 7-51