TM-9-2320-365-34-2 LMTV Direct Maintenance Manual M1078 Series - Volume 2 Download

Page 169 of 1414

TM 9-2320-365-34-2 3-19. OIL COOLER REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Turbocharger removed (para 4-6). Oil filter base removed (para 3-18). Tools and Special Tools Tool Kit, Genl Mech (Item 68, Appendix B) Wrench, Torque, 0-175 lb-ft (Item 80, Appendix B) Materials/Parts Gasket (Item 56, Appendix F) Gasket (Item 59, Appendix F) Spring, Helical Compression (Item 291, Appendix F) Valve, Check (Item 293, Appendix F) Packing, Preformed (Item 188, Appendix F) Packing, Preformed (2) (Item 201, Appendix F) Packing, Preformed (Item 190, Appendix F) Packing, Preformed (Item 192, Appendix F) a. Removal. (1) Disconnect oil tube (1) from 90-degree fitting (2). (2) Remove seven screws (3 and 4), 14 washers (5), oil cooler (6), and gasket (7) from engine (8). Discard gasket. (3) Remove two preformed packings (9) from engine (8). Discard preformed packings. (4) Remove oil cooler core assembly (10) and gasket (11) from oil cooler base (12). Discard gasket. (5) Remove plug (13), spring (14), and check valve (15) from oil cooler base (12). Discard spring and check valve. (6) Remove preformed packing (16) from plug (13). Discard preformed packing. 3-119