TM-9-2320-365-34-2 LMTV Direct Maintenance Manual M1078 Series - Volume 2 Download

Page 121 of 1414

TM 9-2320-365-34-2 CAUTION Keep cylinder head level during installation to prevent damage to dowels. Failure to comply may result in damage to equipment. (10) Apply lubricating oil to threads of 14 bolts (17) and six bolts (18). (11) Position six bolts (18) in cylinder head (4). (12) Position 14 washers (19) and bolts (17) in cylinder head (4). (13) Tighten 14 bolts (17) to 99-121 lb-ft (134-164 N m) in sequence shown. (14) Re-tighten 14 bolts (17) to 305-335 lb-ft (414-454 N m) in sequence shown. (15) Re-tighten 14 bolts (17) to 305-335 lb-ft (414-454 N·m) in sequence shown. (16) Tighten six bolts (18) to 36-46 lb-ft (49-62 N m) in sequence shown. (17) Install preformed packing (20) on fitting (21). (18) Install oil tube (22) on fitting (21). (19) Install preformed packing (23) on 90-degree fitting (8) (20) Connect oil tube (22) on 90-degree fitting (8). 3-73