TM-9-2320-365-34-1 LMTV Direct Maintenance Manual M1078 Series - Volume 1 Download
Page 187 of 1334
Change 1 2-101 TM 9-2320-365-34-1 RESISTANCE TEST (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to pin 1 of turbine speed sensor. (3) Connect negative (-) probe of multimeter to pin 2 of turbine speed sensor and note reading on multimeter. (4) If resistance is less than 200 ohms or greater than 400 ohms, replace transmission turbine speed sensor (para 6-5). (5) If resistance is between 200 and 400 ohms, replace WTEC II TEPSS (TM 9-2320-365-20-3). (6) Connect internal wiring harness connector TSS to turbine speed sensor. (7) Install cover on control valve module with four screws. (8) Install control valve module (para 7-10). (9) Connect adapter cable 24-pin connector to internal wiring harness 24-pin connector. (10) Tighten screw in adapter cable 24-pin connector. (11) Connect batteries (TM 9-2320-365-20-3).