TM-9-2320-365-34-1 LMTV Direct Maintenance Manual M1078 Series - Volume 1 Download

Page 185 of 1334

Change 1 2-99 TM 9-2320-365-34-1 CONTINUITY TEST (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to internal wiring harness 24-pin connector pin E3. (3) Connect negative (-) probe of multimeter to internal wiring harness connector TSS pin B and note reading on multimeter. (4) If continuity is not present, replace transmission internal wiring harness (para 7-13). (5) Connect positive (+) probe of multimeter to internal wiring harness 24-pin connector pin E3. (6) Connect negative (-) probe of multimeter to all other pins in internal wiring harness 24-pin connector and note reading on multimeter. (7) Connect negative (-) probe of multimeter to ground and note reading on multimeter. (8) If continuity is present, transmission internal wiring harness is shorted; replace transmission internal wiring harness (para 7-13).