TM-9-2320-365-20-5 LMTV Unit Maintenance Manual M1078 Series - Volume 5 Download
Page 447 of 666
TM 9-2320-365-20-5 23-8. PRESSURE SWITCH REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-365-10). Air tanks drained (TM 9-2320-365-10). Tools and Special Tools Tool Kit, Genl Mech (Item 44, Appendix C) Goggles, Industrial (Item 15, Appendix C) Materials/Parts Dispenser, Pressure Sensitive Adhesive Tape (Item 21, Appendix D) Antiseize Compound (Item 14, Appendix D) WARNING Wear appropriate eye protection when working under vehicle due to the possibility of falling debris. Failure to comply may result in injury to personnel. a. Removal. NOTE Tag connectors prior to removal. (1) Disconnect connector P84 (1) from pressure switch (2). (2) Remove pressure switch (2) from 90-degree fitting (3). Change 1 23-35