TM-9-2320-365-20-5 LMTV Unit Maintenance Manual M1078 Series - Volume 5 Download
Page 344 of 666
TM 9-2320-365-20-5 20-512 Change 2 20-87 DIGITIZATION KIT CIRCUIT BREAKER REPLACEMENT/INSTALLATION This task covers: a. Removal b. installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-365-10) Batteries discounted (para 7-48) Tools and Special Tools Tool Kit, Genl Mech (Item 44, Appendix C) Personnel Required (2) a. Removal. (1) Removal wing screw (1) from power distribution shelf (2). (2) Loosen wing screw (3) on electrical distribution block cover (4). (3) Remove electrical distribution block cover (4) from power distribution shelf (2). (4) Locate circuit breaker to be replaced. (5) Remove circuit breaker (5) from power distribution panel PD1 (6). NOTE All circuit breakers in digitization power distribution panels PD1 and PD2 are replaced the same way. One circuit breaker shown. NOTE Refer to Figure 3-1. Power Distribution Circuit Breaker Locations and Table 3-1 Power Distribution Circuit Breakers for details.