TM-9-2320-365-20-5 LMTV Unit Maintenance Manual M1078 Series - Volume 5 Download
Page 281 of 666
TM 9-2320-365-20-5  20-76. LIGHT MATERIAL HANDLING CRANE (LMHC) TURRET REPLACEMENT  This task covers:  a. Removal  b. Installation  c. Follow-On Maintenance  INITIAL SETUP  Equipment Conditions  Engine shut down (TM 9-2320-365-10).  LMHC power cable removed (TM 9-2320-365-10).  LMHC remote control cable removed (TM 9-2320-365-10).  Personnel Required  (2)  a. Removal.  WARNING  Light Material Handling Crane (LMHC)  boom assembly weighs approximately 150  lbs (68 kgs). Use an assistant when  removing boom assembly. Failure to  comply may result in injury to personnel.  NOTE  Steps (1) and (2) require the aid of an  assistant.  (1) Remove quick release pin (1) from turret (2).  (2) Remove boom assembly (3) from turret (2).  (3) Remove quick release pin (4) from turret (2).  (4) Remove turret (2) from mast (5).  20-451