TM-9-2320-365-20-5 LMTV Unit Maintenance Manual M1078 Series - Volume 5 Download
Page 278 of 666
TM 9-2320-365-20-5 20-75. LIGHT MATERIAL HANDLING CRANE (LMHC) BOOM SHEAVE REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions LMHC power cable removed (TM 9-2320-365-10). Tools and Special Tools Tool Kit, Genl Mech (Item 44, Appendix C) Gloves, Welders (Item 14, Appendix C) Materials/Parts Nut, Self-Locking (Item 151, Appendix G) Bushing, Sleeve (Item 5, Appendix G) a. Removal. (1) Remove quick release pin (1) from fly section (2). WARNING Wear leather gloves at all times when handling winch cable. Do not allow cable to slide through hands even with gloves on. Broken wires may cause injury to personnel. (2) Remove wire rope (3) from sheave (4). (3) Remove self-locking nut (5), chain assembly (6), screw (7), and washer (8) from fly section (2). Discard self- locking nut. 20-448