TM-9-2320-365-20-5 LMTV Unit Maintenance Manual M1078 Series - Volume 5 Download
Page 179 of 666
TM 9-2320-365-20-5  20-56. 200 AMP ALTERNATOR REPLACEMENT  This task covers:  a. Removal  b. Installation  c. Follow-On Maintenance  INITIAL SETUP  Equipment Conditions  Batteries disconnected (para 7-48).  Alternator belts removed (para 7-3).  Tools and Special Tools  Tool Kit, Genl Mech (Item 44, Appendix C)  Sling, Cargo (Item 31, Appendix C)  Vise, Machinist (Item 46, Appendix C)  Caps, Vise Jaw (Item 4, Appendix C)  Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)  Wrench, Torque, 0-200 lb-in. (Item 58, Appendix C)  Socket Set, Socket Wrench (Item 34, Appendix C)  Materials/Parts  Dispenser, Pressure Sensitive Adhesive Tape  (Item 21, Appendix D)  Nut, Self-Locking (Item 137, Appendix G)  Personnel Required  (2)  a. Removal.  (1) Lift dust boot (1) on terminal lug TL6 (2).  (2) Remove nut (3), lockwasher (4), washer (5), terminal  lugs TL6 (2) and TL2 (6), and fuse link (7) from  alternator terminal (8).  (3) Position fuse link (7), washer (5), lockwasher (4), and nut  (3) on alternator terminal (8).  (4) Lift dust boot (9) on terminal lug TL60 (10).  (5) Remove nut (11), lockwasher (12), washer (13), and  terminal lug TL60 (10) from alternator terminal (14).  (6) Position washer (13), lockwasher (12) and nut (11) on  alternator terminal (14).  Change 1 20-349