TM-9-2320-365-20-4 LMTV Unit Maintenance Manual M1078 Series - Volume 4 Download
Page 81 of 968
TM 9-2320-365-20-4 (9) Raise window frame (10) to vertical position. (10) Latch window frame latch (11) at front of door (2). (10.1) Install upper window channel (11.1) in window frame (10) with six rivets (11.2). NOTE • Use a solution of soap and water to ease installation of rubber sealing strips. • It may be necessary to roll window up and down during installation of rubber sealing strips. (10.2) Install rubber sealing strip (11.3) in upper window channel (11.1). (10.3) Install inner and outer edge seals (11.4 and 11.5) in window sill (11.6). Change 1 16-43