TM-9-2320-365-20-4 LMTV Unit Maintenance Manual M1078 Series - Volume 4 Download
Page 723 of 968
TM 9-2320-365-20-4 19-9. SUSPENSION CYLINDER REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-365-10). Cab raised (TM 9-2320-365-10). Tools and Special Tools Tool Kit, Genl Mech (Item 44, Appendix C) Goggles, Industrial (Item 15, Appendix C) Gloves, Rubber (Item 13, Appendix C) Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C) Wrench, Torque, 0-600 lb-ft (Item 59, Appendix C) Wrench, Torque, 0-200 lb-in. (Item 58, Appendix C) Socket Set, Socket Wrench (Item 34, Appendix C) Wrench Set, Socket (Item 48, Appendix C) Materials/Parts Cap and Plug Set (Item 15, Appendix D) Packing, Preformed (2) (Item 166, Appendix G) Nut, Self-Locking (Item 116, Appendix G) Pin, Cotter (Item 204, Appendix G) Hydraulic Fluid A (Item 26, Appendix D) Personnel Required (2) a. Removal. NOTE Left and right suspension cylinders are removed the same way. Right side shown. (1) Remove two quick release pins (1) from suspension cylinder (2). (2) Remove screw (3) and two lanyards (4) from suspension cylinder (2). 19-39