TM-9-2320-365-20-4 LMTV Unit Maintenance Manual M1078 Series - Volume 4 Download

Page 370 of 968

TM 9-2320-365-20-4 16-51. M1079 FIELD TELEPHONE BINDING POST/BOX AND CONDUIT REPLACEMENT (CONT) NOTE Perform step (4) for PHONE 2 outlet box installation. (4) Route wires 1499F (8), 3085G (9), 702F (10), 425A (11), and 424A (12) through conduit (7). NOTE Perform step (5) for PHONE 1 outlet box installation. (5) Route wires 1499D (8), 3085J (9), 702F (10), 702C (13), two wires 425 (11), and two wires 424 (12) through conduit (7). NOTE Perform step (6) for PHONE 2 outlet box and/or conduit installation. (6) Connect blackout light connector J164 (14) to connector P164 (15). NOTE Perform step (7) for PHONE 1 outlet box and/or conduit installation. (7) Connect blackout light connector J162 (14) to connector P162 (15). (8) Install raceway cover (16) on raceway (2) with 12 washers (17), lockwashers (18), and screws (19). 16-322